This section is one of the largest engineering departments. And contains engineers from various disciplines and who have considerable experience in the implementation and project management. This section is held to the implementation of a number of road projects and open irrigation channels and water pipelines and electricity networks. We include your most important projects we've made :-
1- Open A new channel in Al –Nahrawan City/ Baghdad (Soil Works) . The project include prepare & digging a New Irrigation channel with length (28.25 km) for feed the south farms in the City.
2- Supply & Install Irrigation Pump station in BAGDAD City. The project include remove the old pumps and supply , install four horizontal centrifugal pump with capacity 1m3/s and rated head 17m .The installation was included Furnish, install and test an electrical control panel with cabinet and cable connections to the pumps.
3- Al- NAHRAWAN Irrigation Project . The project include complete all civil & irrigation works in this project . it built two brick building with bathroom and kitchen all necessary equipment to house the pump station operators and guards, also complete of Clean, repair bank and bottom failures in the 5 km of Al- Karguila canal in Al-Nahrawan area.
4- Design & paved Abu GARIB Road . The project include Provide the labor, supervision, equipment, and materials to complete the pavement of 2km of rural village roads in Abu GARIB city.
5- Paved Al SADER City Roads . The project include Provide the labor, supervision, equipment, and materials to complete the pavement of 5Km.
6- Rehabilitation Waste Treatment Plant . The project include rehabilitee the aeration tanks and the drying beds. Laying A New Sewer Line . The company was responsible to Supply and laying a new sewer line (Length 3 km) & Diameter (1000m m) .
7- Clean & Lining stilling basin with stone rip rap project in Diyala city. The project include clean a stilling basin with dimensions (115 X84X5.25)m from debris in first stage . the second stage was lining the basin with stone rip rap and grouting its joints by cement mortar after compact it.
8- Water network installation in /Baghdad. The project include supply and install water network form uPVC plastic water pipe and fittings rated Class 4 (10 bar).the total length of network was about 6250 m.
10- Project implementation of the Close system fish firm the German breeding fish in the ALSWEERA DIRECTORATE /KUT city.
11- Installation of fish net cages by Germany Fishtechnik company in ALMUSAEB city .
12 - install many mobile tower in differnt area in IRAQ.
13- Many Schools and Houses in different area in IRAQ.