1- PROJECT ENGINEERING DEPARTMENT
Which
is the department responsible to implementation of consultation studies,
design, engineering tests and survey. The group has to implementation of
several of the most important projects :-
1- Design
and survey best routes of flow lines ,pipelines ,electric lines and
topographic survey of degassing stations in SUBBA and LUHAIS development
of oil field projects / BASRA city
2-
Prepare Soil investigation for Guesthouse Council of Ministers in
BAGHDAD city.
3-
Assess the KARKH Sewage Plant in BAGHDAD (Engineering
study and
environmental and
giving solutions and
treatments)
4-
Design
and survey best routes of pipelines and topographic survey of degassing
stations for HAMREEN development of oil project.
5-
Prepare soil investigation and assessment of foundation for degassing
stations in HAMREEN oil field /SALAH ALDIN city.
6-
Re-Survey and line numbering of the BAGHDAD railway - BAGHDAD - BASRA -
UMM QASR, and the processing of marks for the projects kilometers (HILLA
- SAMAWA) and (SAMAWA GHABISHIYA) and (GHABISHYA - BASRA - UMM QASR).
7-
Implementation project
water quality
monitoring system
for
fish ponds
after
8-
Detailed design of ALAMARA water network.
9-
Detailed design of RAMADI water network.
10-
Detailed design of DIWANIYA water network with hydrological
study.
11-
ALZUBAIR ESH baseline study/ wells survey.
12-
Test the soil resistively for routes of pipelines and stations area
BASRA oil field.
13-
Survey of degassing stations, pipelines , Bldgs, and all facilities in
FCP site in GARRAF development of field project .
14-
Survey of degassing stations, pipelines , Bldgs, and all facilities
in LSB site in ALZUBAIR development of oil field project.
15-
Establish an electronic map of BAGHDAD roads network.
16-
Civil and architectural designs for the national theatre building in
BAGHDAD.
17-
Hydrological study and giving solutions for treatment the shortage in
MOSUL city.
|